Green Square North Tower, Brisbane, Australia

ECI worked with MMM Mechanical Services and Leighton Contractors to achieve a 6 star Green rating. Our customised design met plant room requirements as well as stringent Brisbane City Council air policy regulations.

It was the first building in Australia to use a natural gas Co-gen system fitted with SCR (Selective Catalytic Reduction) for NOx abatement. The SCR System and Oxidation Catalyst was able to treat the exhaust gas prior to the direct fired absorption chiller, which supplied cooling for the building.

ECI designed and manufactured all components which included the Silencer, Oxidation Catalyst and the SCR System for the genset to meet stringent Australian Standards for gas
appliance code, Air Policy Regulations and Plant Room limitations.